Several installation precautions for three-legged centrifuge

1. If there is a foundation, the concrete foundation must be poured according to the installation size. The positions of the three feet must be corrected and powdered. After 96 hours of drying, place a rubber mat of 5-10 mm thick at the three foot positions to make the foundation. To achieve the function of damping, then place the centrifuge and tighten the nut; without foundation, no concrete pouring is required.

2. Care must be taken before installation, pay attention to the moisture resistance of the motor, electric control device, hydraulic system, air control system and all rust-proof parts, and pay attention to the protection of the outer surface of the machine.

3. The electric control cabinet (air control box) should be placed in a place with dry, ventilated and non-corrosive gas, and should be near the host (can be installed separately).

4. The centrifuge must be installed and placed horizontally.

5. The machine is generally installed on the whole machine and must not be disassembled. If it is necessary, it must be confirmed by the manufacturer's technician after assembly.

6. The centrifuge has slight vibration during high-speed operation, so the pipe connected to the centrifuge (feeding pipe, outlet pipe, washing pipe, exhaust pipe, online cleaning pipe, nitrogen pipe, compressed air pipe, cable pipe, etc.) It must be flexible and the connection must have a reliable seal or insulation.

7. The centrifuge should have a grounding device to ensure no leakage and safe use of electricity.